Præsentation er lastning. Vent venligst

Præsentation er lastning. Vent venligst

FNI marts 2003. Dupline introduction. FNI marts 2003. Sensors, Switches, Relays, Valves, Motors Counters, Timers, Drives Dupline PLC's PC's, SCADA Prod.

Lignende præsentationer


Præsentationer af emnet: "FNI marts 2003. Dupline introduction. FNI marts 2003. Sensors, Switches, Relays, Valves, Motors Counters, Timers, Drives Dupline PLC's PC's, SCADA Prod."— Præsentationens transcript:

1 FNI marts 2003. Dupline introduction

2 FNI marts 2003. Sensors, Switches, Relays, Valves, Motors Counters, Timers, Drives Dupline PLC's PC's, SCADA Prod. Comp. Plant Computer Net Component Level Device Level Process Level Prod. Level Plant Hierarchy structure for “Industrial Automation” Dupline introduction

3 FNI marts 2003. How the system operates Dupline introduction

4 FNI marts 2003. Dupline introduction Cabling Sender Carlo Gavazzi C1 C2 Master Generator

5 FNI marts 2003. Netz x-numbers of push buttons can control one or more outputs Dupline introduction A1A5 Carlo Gavazzi Receiver A1A5 A1A5 A1A5 Sender Carlo Gavazzi C1 C2 Master Generator

6 FNI marts 2003. Netz One or more push buttons can control x-numbers of outputs Dupline introduction Carlo Gavazzi Receiver Carlo Gavazzi Receiver Carlo Gavazzi Receiver Sender Carlo Gavazzi C1 C2 Master Generator A1A5 A1A5 A1A5 A1A5

7 FNI marts 2003.

8 . Programing of smart-house

9 FNI marts 2003. Puls Train Dupline introduktion 8.2 2.2 t 128 x 1 ms 8 ms 128 pulser 136 ms V Synk.

10 FNI marts 2003. 8.2 2.2 8.2 2.2 0 t t.25 ms.75 ms.5 ms 0 Dupline introduktion Input Output Split I/O Function CONFIGURATION Sender Carlo Gavazzi Master Generator

11 FNI marts 2003. Sender Carlo Gavazzi C1 C2 Master Generator B2B4 B1B3 Carlo Gavazzi Receiver B3B4B1B2

12 FNI marts 2003. 16 groups with 8 channels in each Groups Channels : 1 to 8 (1, 2, 3, 4, 5, 6, 7, 8) I/O addresses: A1, A2,... C5,... P8 : A to P ( A, B, C, D, E, F, G, H, I, J, K, L, M, N, O, P) Addressing Dupline introduktion

13 FNI marts 2003. Windows configuration

14 FNI marts 2003. 1 2 3 4 5 6 7 8 Dupline ASIC Progammer GAP 1605 A B C D E F G H I J K L M N O P 1 2 3 4 5 6 7 8 In/Out Group Channel Read/On Prog CARLO GAVAZZI 8 adresser

15 FNI marts 2003. 1 2 3 4 5 6 7 8 Dupline ASIC Progammer GAP 1605 A B C D E F G H I J K L M N O P 1 2 3 4 5 6 7 8 In/Out Group Channel Read/On Prog CARLO GAVAZZI 1) Turns ON 2) READ IN DISPLAY In/Out 1 Group C Channel 2 Input or output 1 is addressed to C2 Reading

16 FNI marts 2003. 1 2 3 4 5 6 7 8 Dupline ASIC Progammer GAP 1605 A B C D E F G H I J K L M N O P 1 2 3 4 5 6 7 8 In/Out Group Channel Read/On Prog CARLO GAVAZZI 1) Turn ON 3) Select Group 4) Select Channel 5) Press “Prog” New address 2) Select IN/OUT

17 FNI marts 2003. 1 2 3 4 5 6 7 8 Dupline ASIC Progammer GAP 1605 A B C D E F G H I J K L M N O P 1 2 3 4 5 6 7 8 In/Out Group Channel Read/On Prog CARLO GAVAZZI 8 addresses

18 FNI marts 2003. 1 2 3 4 5 6 7 8 Dupline ASIC Progammer GAP 1605 A B C D E F G H I J K L M N O P 1 2 3 4 5 6 7 8 In/Out Group Channel Read/On Prog CARLO GAVAZZI 1) Turn ON 3) Select group 4) Select channal 6) Push “Prog” (Programming of the addresses can wait until the last in/output address have been selected) New addresses 2) Select In/Output 5) Go to next in/output (continue from 2) Programing of OPUS/FUGA

19 FNI marts 2003. 1 2 3 4 5 6 7 8 Dupline ASIC Progammer GAP 1605 A B C D E F G H I J K L M N O P 1 2 3 4 5 6 7 8 In/Out Group Channel Read/On Prog CARLO GAVAZZI IN/OUT placement of OPUS/FUGA 1) Turn ON 3) Select group 4) Select channal 2) Select In/Output 6) Push “Prog” (Programming of the addresses can wait until the last in/output address have been selected) 1 2 3 4 5 6 7 8 In/ 1 2 3 4 5 6 7 8 /Out OPUS FUGA 5) Go to next in/output (continue from 2)

20 FNI marts 2003. IN/OUT placement OPUS/FUGA 1 2 3 4 5 6 7 8 Dupline ASIC Progammer GAP 1605 A B C D E F G H I J K L M N O P 1 2 3 4 5 6 7 8 In/Out Group Channel Read/On Prog CARLO GAVAZZI 1 2 3 4 5 6 7 8 In/Out 1 2 3 4 5 6 7 8 In/Out OPUS FUGA

21 FNI marts 2003.

22 . Dupline test unit GTU 8

23 FNI marts 2003. A 1 - 3 - - - - 8 13 Mode Enter 456 1 23 Dupline Test Unit GTU 8 78 Select Channel group Show the channel status MODE: DIGITAL 1 GROUP Activates the channel ON 7 Display of the status of a chosen channel group 8

24 FNI marts 2003. El-installations principper Fra parallel fortrådning til

25 FNI marts 2003. Installation med kabel Fordele Billigt og hurtigt installationsprincip Bus i hele installationen Største forsyningskapacitet af busforsynede komponenter Ulemper Vanskelig montage af bus i tryk 1,5 Stærk- og svagstrøm fremføres sammen Vanskelig at udvide med ekstra ledninger 25

26 FNI marts 2003. Installation med kabel, bus i separat svagstrømskabel Fordele Billigt og hurtigt installationsprincip Nem montage af tryk 0,5 Adskilt stærk- og svagstrøm Ulemper Ikke bus i hele installationen Lille forsyningskapacitet (ved brug af lille kvadrat) Vanskelig at udvide med ekstra ledninger 26

27 FNI marts 2003. Rørinstallation med PVL-ledning Fordele Bus i 0,5 giver synlig forskel på ledningerne Bus i hele installationen Nem montage af tryk 0,5 Nem udvidelse af installationen Stor forsyningskapacitet af busforsynede komponenter Ulemper Prisen på installationen Stærk- og svagstrøm fremføres sammen 27

28 FNI marts 2003. Dupline Smart-house princip

29 FNI marts 2003. Dupline Smart-house princip

30 FNI marts 2003. 100 % Decentralt koncept

31 FNI marts 2003.

32 .

33 .

34 .

35 .

36 .

37 .

38 .

39 .

40 .

41 .

42 .

43 .

44 .

45 .

46 .

47 .

48 .

49 .

50 .

51 .

52 .

53 . Wireless LAN, (Bluetooth)

54 FNI marts 2003.


Download ppt "FNI marts 2003. Dupline introduction. FNI marts 2003. Sensors, Switches, Relays, Valves, Motors Counters, Timers, Drives Dupline PLC's PC's, SCADA Prod."

Lignende præsentationer


Annoncer fra Google